KNT-KTN Field

Staging pipes and pipeline fittings in the yard, counting by lot and delivering to site in step with welding progress.

Oil and gas pipes must be stacked correctly and their anti-corrosion coating protected. The yard uses timber dunnage at specified spacing, and each lot has a code and condition photos for checking at release.

How it was done

01

Received at port, checked packaging and anti-corrosion coating

02

Stacked in the yard by lot, coded and photographed

03

Periodic counts and stock reports by lot

04

Released to site in step with welding progress

05

Reconciled and settled quantities at project close

Open yard for equipment staging

Industrial cargo at port

Industry Oil & gas
Type Project Cargo
Services used Warehousing · Transport
Special requirement Protecting the anti-corrosion coating

A similar project?

Send cargo specifications and the delivery point; we survey the route within 3–7 days.

Request a survey
← All projects

Other projects

Long Thanh Airport Project

Infrastructure

KY2 Windfarm

Energy

Lach Huyen Port

Seaports

☎ Zalo